In a typical setup, the network overlay tunnel is terminated at the Virtual/Tunnel End Point (VEP/TEP).
The TEP is normally located at the physical host level ideally in the software switch.
Due to processing constraints and the inevitable bottleneck that the switch
In a typical setup, the network overlay tunnel is terminated at the Virtual/Tunnel End Point (VEP/TEP).
The TEP is normally located at the physical host level ideally in the software switch.
Due to processing constraints and the inevitable bottleneck that the switch