X-Git-Url: https://gerrit.fd.io/r/gitweb?p=csit.git;a=blobdiff_plain;f=docs%2Fcpta%2Fintroduction%2Findex.rst;fp=docs%2Fcpta%2Fintroduction%2Findex.rst;h=229e9e3da9a9e61a2e4a80285abf0d1a581ab3c8;hp=991181aff461e14ba66155708b4d3d8c8e8fd978;hb=2e63ef13b419da1198439617e66cb0f1cfe6be65;hpb=39b4a07718ecab94ea331362edb62dfcf678bd09 diff --git a/docs/cpta/introduction/index.rst b/docs/cpta/introduction/index.rst index 991181aff4..229e9e3da9 100644 --- a/docs/cpta/introduction/index.rst +++ b/docs/cpta/introduction/index.rst @@ -8,17 +8,18 @@ Performance dashboard tables provide the latest VPP throughput trend, trend compliance and detected anomalies, all on a per VPP test case basis. Linked trendline graphs enable further drill-down into the trendline compliance, sequence and nature of anomalies, as well as -pointers to performance test builds/logs and VPP builds. Performance -trending is currently based on the Maximum Receive Rate (MRR) tests. MRR -tests measure the packet forwarding rate under the maximum load offered +pointers to performance test builds/logs and VPP (or DPDK) builds. +Performance trending is currently based on the Maximum Receive Rate (MRR) tests. +MRR tests measure the packet forwarding rate under the maximum load offered by traffic generator over a set trial duration, regardless of packet loss. See :ref:`trending_methodology` section for more detail including trend and anomaly calculations. -Data samples are generated by the CSIT VPP performance trending jobs +Data samples are generated by the CSIT VPP (and DPDK) performance trending jobs executed twice a day (target start: every 12 hrs, 02:00, 14:00 UTC). All -trend and anomaly evaluation is based on a rolling window of data -samples, covering last 7 days. +trend and anomaly evaluation is based on an algorithm which divides test runs +into groups according to minimum description length principle. +The trend value is the population average of the results within a group. Failed tests ------------ @@ -53,7 +54,6 @@ Legend to the tables: maximum of trend values over the last quarter except last week. - **Regressions [#]**: Number of regressions detected. - **Progressions [#]**: Number of progressions detected. - - **Outliers [#]**: Number of outliers detected. Tested VPP worker-thread-core combinations (1t1c, 2t2c, 4t4c) are listed in separate tables in section 1.x. Followed by trending methodology in