Signed-off-by: Tibor Frank <tifrank@cisco.com>
Change-Id: I7127e0b0a08d0c1cebda6ad06f6d89994a1903b5
Reconfiguration Tests
---------------------
-.. important::
-
- **DISCLAIMER**: Described reconf test methodology is experimental, and
- subject to change following consultation within csit-dev, vpp-dev
- and user communities. Current test results should be treated as indicative.
-
Overview
~~~~~~~~
VNF Service Chains
==================
-.. important::
-
- **DISCLAIMER**: Presented test results should be taken with a pinch of
- salt as they may not represent correctly the system behaviour due
- to experimental nature of used test methodology (see :ref:`reconf_tests`).
-
In each test, a single service chain is added, the re-configuration
contains all the steps the initial chains got, except the last step
(starting VMs) is skipped.