1 Trend Presentation
2 ^^^^^^^^^^^^^^^^^^
3
4 Failed tests
5 ~~~~~~~~~~~~
6
7 The Failed tests tables list the tests which failed during the last test run.
8 Separate tables are generated for each testbed.
9
10 Regressions and progressions
11 ^^^^^^^^^^^^^^^^^^^^^^^^^^^^
12
13 These tables list tests which encountered a regression or progression during the
14 specified time period, which is currently set to the last 21 days.
15
16 Trendline Graphs
17 ~~~~~~~~~~~~~~~~
18
19 Trendline graphs show measured per run averages of MRR values, NDR or PDR
20 values, group average values, and detected anomalies.
21 The graphs are constructed as follows:
22
23 - X-axis represents the date in the format MMDD.
24 - Y-axis represents run-average MRR value, NDR or PDR values in Mpps. For PDR
25   tests also a graph with average latency at 50% PDR [us] is generated.
26 - Markers to indicate anomaly classification:
27
28   - Regression - red circle.
29   - Progression - green circle.
30
31 - The line shows average MRR value of each group.
32
33 In addition the graphs show dynamic labels while hovering over graph data